皇冠体彩APP

Note:
  • No Information
  •       
  • Search:
  • Daguangba Water Conservancy and Hydropower Project Phase II (irrigation area) in Hainan province

    Promulgator:广东水利   Send date: 2013/12/20 15:38:40 Visitor: 1217

     

      

     

      The project is located in the southwest of Hainan Island. It is a large-scale project of Grade Ⅱ with the design irrigated area of 1.0108 million mu and a total length of around 500 km. The irrigation project is divided into five irrigation area systems, i.e. high main canal, medium main canal, low main canal, ChangJiang main canal and Tuoxin main canal. GPDI undertook the engineering investigation and design of Changjiang main canal system and low main canal system, including 235 km long channels and 785 canal system structures. A test operation was carried out on January 18th, 2013.


  •   Print this paper
  •  
    • Copyright © 2004-2011 Guangdong Hydropower Planning & Design Institute. All Right Reserved . Technical Support Liyang
    • Address: 116 Tianshou Road, Tianhe District, Guangzhou, China. Zip Code: 510635, TEL: (020)38356800 38356600