皇冠体彩APP

Note:
  • No Information
  •       
  • Search:
  • Continuous construction of auxiliary works and reconstruction of water-saving works of Leizhou Qingnian Canal irrigation

    Promulgator:广东水利   Send date: 2013/12/24 9:30:51 Visitor: 1101

     

      

     

      The project is located in the north of Leizhou Peninsula of Guangdong Province. The flow of main canal is 110m3/s. It is of Grade Ⅱ. The project includes 6 main canals with the total length of 277km, namely the main canal, Silian Canal, Donghai Canal, Xihai Canal, East Canal and West Canal. The total investment is 1.586 billion RMB. The project commenced in January, 2009.


  •   Print this paper
  •  
    • Copyright © 2004-2011 Guangdong Hydropower Planning & Design Institute. All Right Reserved . Technical Support Liyang
    • Address: 116 Tianshou Road, Tianhe District, Guangzhou, China. Zip Code: 510635, TEL: (020)38356800 38356600