皇冠体彩APP

Note:
  • No Information
  •       
  • Search:
  • Dadongkou, Sanjiangkou, Longquan Sluices of Danger Removal and Reinforcement Project of Jiangxin Levee

    Promulgator:广东水利   Send date: 2013/12/24 9:31:21 Visitor: 1088

     

      

     

      Dadongkou, Sanjiangkou, Longquan Sluices are the three sluices of four newly built closed sluices in Danger Removal and Reinforcement Project of Jiangxin Levee. The standard of design flood/tide is 100-year return. The main structures are of Level 2 and the secondary structures are of Level 3. The total investment is 310.4 million RMB. The project was commenced in November, 2009.


  •   Print this paper
  •  
    • Copyright © 2004-2011 Guangdong Hydropower Planning & Design Institute. All Right Reserved . Technical Support Liyang
    • Address: 116 Tianshou Road, Tianhe District, Guangzhou, China. Zip Code: 510635, TEL: (020)38356800 38356600